Customs Comitee Building
Project name: Manufacturing of Façade Secondary steel structure for Customs Comitee Building
Client: FF Construction
Location: Baku, Azerbaijan
Scope of Work:
- BCC Group has recently completed with manufacturing of 160 metal modules.
Each of the modules has 10 floors height and approximately 1-ton weight. The purpose for these modules is to be used for installation of the façade glass-metal part of the Customs Committee building.
All released modules were installed in the field conditions by using anchor bolts and reinforced concrete cladding, as well as welded joints of the modules.
The project, with a total weight of 170 tons, will be covered with 1280 pieces of glass.
Year: 2021